Results 1 to 5 of 5

Thread: Scheduling Door Details

  1. #1
    I could stop if I wanted to rdaniel's Avatar
    Join Date
    2006-12
    Location
    Dallas, TX
    Posts
    215
    Login to Give a bone
    0

    Default Scheduling Door Details

    So, I spent a while yesterday afternoon perusing the posts on this topic and found that while it has been a topic for some time now, any real conclusion is yet to really be arrived at. My first idea at handling the door details was just to add 3 shared parameters to each door family (head, jamb, sill) and schedule each one individually (this is similar to how we handle it now in ADT or ACA). If you have arrived at a more efficient way of handling these guys in your experience, do share here, and if you want to attach any door families or shared parameter files with it all already set-up, well then, even better. As a Revit newbie, I am learning a lot from studying how others set-up things.

    Muchas gracias.

  2. #2
    Certified AUGI Addict patricks's Avatar
    Join Date
    2004-06
    Location
    Memphis TN area
    Posts
    7,048
    Login to Give a bone
    0

    Default Re: Scheduling Door Details

    Since every door/window detail sheet on every one of our jobs is different (each detail is different, and the placement of details is different), we just have to go down the schedule and type in the locations of where each detail occurs on the detail sheet.

    Another way would be to place section markers on the door and window elevations that link to the detail locations, and not have it in the schedule, but since Legend views don't allow section or callout marks, that idea is out the, um.... window.

  3. #3
    I could stop if I wanted to rdaniel's Avatar
    Join Date
    2006-12
    Location
    Dallas, TX
    Posts
    215
    Login to Give a bone
    0

    Default Re: Scheduling Door Details

    Patricks,

    Noticed you are in Southaven. I grew up a bit south of you in the H'burg. I guess you guys prob. do a lot of work in Memphis, but how is the arch. market in MS overall?

  4. #4
    Certified AUGI Addict patricks's Avatar
    Join Date
    2004-06
    Location
    Memphis TN area
    Posts
    7,048
    Login to Give a bone
    0

    Default Re: Scheduling Door Details

    We only do a small amount of work in the Memphis area. Most of our stuff is in north MS, and we have GOBS of work, we just about can't handle it in our small office of only 4 Revit users. We probably have at least 30, if not more, currently active project numbers, either in design or under construction right now.

  5. #5
    I could stop if I wanted to rdaniel's Avatar
    Join Date
    2006-12
    Location
    Dallas, TX
    Posts
    215
    Login to Give a bone
    0

    Default Re: Scheduling Door Details

    Well, very good then and congrats on the engagement.

Similar Threads

  1. Room Scheduling (Same for Window, Door, etc)
    By avj_richardson899432 in forum Revit Architecture - General
    Replies: 2
    Last Post: 2012-04-11, 05:50 PM
  2. Scheduling Wall Type Details...
    By chris.klinert in forum ACA General
    Replies: 0
    Last Post: 2008-11-06, 07:40 PM
  3. Scheduling Door Swings
    By chosford in forum Revit Architecture - Families
    Replies: 6
    Last Post: 2008-02-11, 09:18 PM
  4. Scheduling Door Material with yes/no paramters
    By andymeyer50 in forum Revit Architecture - Families
    Replies: 3
    Last Post: 2007-10-01, 07:30 PM
  5. More Door Scheduling Woes
    By jcoe in forum Revit Architecture - General
    Replies: 5
    Last Post: 2005-11-09, 01:48 AM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •