Results 1 to 1 of 1

Thread: Schedules - Doors, Windows, Store Front Glass, & CWalls

  1. #1
    Member
    Join Date
    2003-08
    Location
    Lexington, KY
    Posts
    38
    Login to Give a bone
    0

    Default Schedules - Doors, Windows, Store Front Glass, & CWalls

    A good suggestion made to me by my hand drafting only boss was to add the symbol used in the mark above mark label in the schedule. See attached image. Right now I have a Symbol Legend done up as a generic anno. How do others deal with explaining the same number used in different places. i.e. room 3 has, door 3, window 3, and window 3a.

    Millard

    Edit: Moved from Wishlist Forum. Not a wish.
    Attached Images Attached Images
    Last edited by beegee; 2004-08-03 at 09:35 PM.

Similar Threads

  1. Store front in schedules
    By Carlos GT in forum Revit Architecture - General
    Replies: 16
    Last Post: 2008-11-03, 04:46 PM
  2. Existing store front w/ a new door
    By Don Sutherland in forum Revit Architecture - General
    Replies: 5
    Last Post: 2007-05-17, 03:17 PM
  3. Doors and Windows on a sheet with Schedules
    By ron.sanpedro in forum Revit Architecture - General
    Replies: 8
    Last Post: 2006-11-15, 01:21 AM
  4. schedule Doors, Windows, and Store Front systems.
    By ihammerhands in forum Revit Architecture - General
    Replies: 4
    Last Post: 2003-12-05, 11:09 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •