I am embarking on a very large job, (for me anyway), over 100 acres, with 5 linked files, 22 buildings in total on a sloping site. One of the buildings is repeated 18 times, and as we have previously built a couple of them, we have all the drawings and details in CAD externally. Do the Revit Jedi have any advice for me as I set the whole thing up? Although the site will be large, it won't be terribly detailed. Should it be worksetted for example? Will this assist in regen times?
Your thoughts please. Thank you in advance!