I have a section of duct and a VAV that will be removed. Then on the install drawing I am going to reinstall the VAV on the other side of a slab to slab wall. When I add a section of new duct from the relocated VAV to the existing duct the New and Exist. duct become the same phase. How do you keep them separate New and Existing?