I am using massing for the initial stages of a multi-level apartment project and was hoping
to generate schedules for areas such as Internal Unit, Walkways, Balconies etc.
Of course I have to place Floor Faces for the areas to be calculated.
The balconies & walkways are masses that extrude from floor level to 200mm below floor level.
What I'm finding is that even though Floor Faces have been selected, they don't always generate.
The top of the mass has to be something higher than 50mm above floor level for them to show up.
Any help would be appreciated.