Results 1 to 2 of 2

Thread: Door Schedule between linked files

  1. #1
    I could stop if I wanted to Chirag Mistry's Avatar
    Join Date
    2004-06
    Location
    Atlanta
    Posts
    254
    Login to Give a bone
    0

    Default Door Schedule between linked files

    I just noticed that we can't filter door schedules between linked files using Levels. I can work around it using the filter begins with 2, 3, 4 ..., but thought this was odd.

  2. #2
    Certifiable AUGI Addict Dimitri Harvalias's Avatar
    Join Date
    2015-12
    Location
    Vancouver, BC Canada
    Posts
    3,753
    Login to Give a bone
    0

    Default Re: Door Schedule between linked files

    Seems you're not the only person who noticed.

    http://forums.augi.com/showthread.ph...evel+door+link

Similar Threads

  1. 2014: Revit Door Schedule from Linked Files (Typical Floors)
    By zilong245 in forum Revit - Platform
    Replies: 0
    Last Post: 2013-12-12, 08:55 AM
  2. Door Schedule to read Room (to and From) through Linked File
    By Wish List System in forum Revit Architecture - Wish List
    Replies: 2
    Last Post: 2012-06-12, 06:03 PM
  3. Creating a schedule from linked RVT files
    By jthompson.70974 in forum Revit Architecture - General
    Replies: 21
    Last Post: 2010-03-17, 04:28 PM
  4. Linked models and door window schedule
    By STHRevit in forum Revit Architecture - General
    Replies: 3
    Last Post: 2008-11-14, 11:17 AM
  5. RAC 2008 : Door Schedules and linked files...
    By FWSchreck in forum Revit Architecture - General
    Replies: 1
    Last Post: 2008-07-15, 07:20 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •