here's the scenario...
we are developing a campus of three buildings...
- 2 buildings are in phase 1; 1 in phase 2
what's the best way to set up the file so we can produce one set of construction documents for each phase?
can/do we...
1. build each building as a seperate 'model' file and link them into a 'documentation' file? can you create all the views and schedules etc from the linked models.
2. build all three buildings in one file? how do you manage the three buildings to produce a site drawing with true north and floor plans with specific building norths?
3. build each as seperate files with their own documentation? can you reference details in another file. for example" create a detail (4/A4.1) in building set 1 and reference it in building set 2? This is a campus that we are doing so details will be shared by all three builidngs.
4. OTHER - any ideas or better yet tried and true methods????