Thread: Concrete slab won't cut Concrete Foundation Wall

  1. #1
    100 Club
    Join Date
    2007-07
    Location
    Madison, WI
    Posts
    185
    Login to Give a bone
    0

    Default Concrete slab won't cut Concrete Foundation Wall

    I can't get a Conc SOG to cut a Conc Found wall. When I finish the floor sketch I am asked if I want to join/cut the overlapping volume of the floor from the wall and I click yes. Then when I look at the section the slab is joined to the wall (I assume because of same material.) When I change the thyp of floor to a truss structure the wall cuts fine.

    When I sketch the floor, if I pick the First floor walls with the "pick walls" command, I don't get the option to join/cut the overlapping geometry (since there isn't any between that wall and the floor. I also can use the cut geometry tool to cut the slab from the foundation wall at that point.

    Any pointers? I want the Conc Slab to display similarly to the truss floor. See pics below.
    Attached Images Attached Images

Similar Threads

  1. 2013: Concrete Slab/Concrete Beam Join
    By lowm445034 in forum Revit Structure - General
    Replies: 1
    Last Post: 2013-11-21, 03:59 PM
  2. Concrete Foundation Embed Pockets
    By darrell.badger in forum Revit Structure - General
    Replies: 1
    Last Post: 2012-12-07, 12:54 AM
  3. 2012: Concrete Beam Won't Join Concrete Roof Slab at Ridge..HELP
    By tedg in forum Revit Structure - General
    Replies: 8
    Last Post: 2012-10-15, 07:15 PM
  4. How do I turn off the concrete slab?
    By thenickster_7 in forum Revit MEP - General
    Replies: 5
    Last Post: 2010-04-29, 06:32 PM
  5. Replies: 8
    Last Post: 2007-05-17, 02:37 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •