Results 1 to 2 of 2

Thread: date stamp

  1. #1
    100 Club chris.macko125036's Avatar
    Join Date
    2006-10
    Location
    Chicago, IL
    Posts
    133
    Login to Give a bone
    0

    Default date stamp

    This seems like it should be simple, but is there a way to use the date stamp on a drawing sheet, but not show the seconds? We are trying to setup a revit sheet for a new project and the client wants the plot date/time in a field of their title block, but with the seconds showing it does not fit in the box. We could just use a text parameter, but it would be much nicer if it could be automated.

  2. #2
    Certifiable AUGI Addict Dimitri Harvalias's Avatar
    Join Date
    2015-12
    Location
    Vancouver, BC Canada
    Posts
    3,753
    Login to Give a bone
    0

    Default Re: date stamp

    Revit takes this formatting from your overall Windows system settings. You should be able to modify this from the Control Panel > Regional and Language options.
    Keep in mind it's probably an all or nothing proposition though and it will affect other programs.

Similar Threads

  1. Customize Date stamp?
    By ben76red in forum Revit Architecture - General
    Replies: 1
    Last Post: 2010-06-16, 12:49 PM
  2. date stamp
    By mgonzales.224492 in forum AutoLISP
    Replies: 7
    Last Post: 2010-01-22, 09:58 PM
  3. Date Stamp
    By alana116 in forum CAD Management - General
    Replies: 2
    Last Post: 2008-07-15, 07:26 PM
  4. Date Stamp Routine
    By robert.1.hall72202 in forum AutoLISP
    Replies: 25
    Last Post: 2005-06-03, 12:31 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •