Originally Posted by
Doodlemusmaximus
Okay I am really pulling my hair out with this one. In fact I've never come across this before so I'm hoping someone out there has some idea. We've just had 2008 installed (I know a bit behind the times) and it seems to have a bit of a hiccup occasionally. you'll draw something, or offset it by a set amount and when it comes to it the distance isn't what you put in. For instance I'll put in an offset of say 8000 and then measure it only to find it is 800.00258 blah de blah. I'm sure your getting the picture by now.
Anyway I thought it was the drawing but it does it on different drawings and on everyone’s machine in the office. So hence why I'm thinking its a program or set up problem.
If you can let me know as its most annoying.
Cheers in advance
Doodlemus