See the top rated post in this thread. Click here

Results 1 to 3 of 3

Thread: Revit formulas yes/no

  1. #1
    Member
    Join Date
    2008-04
    Posts
    20
    Login to Give a bone
    0

    Default Revit formulas yes/no

    I am baffled. i have 3 yes no formulas. A B and C If one is on I want the others to be off. I tried to make A be the one that is on turning off the others with this formula A = Not (B, C). I am not sure what I have wrong. Please help
    Thanks,
    ~Scott

  2. #2
    All AUGI, all the time davidcobi's Avatar
    Join Date
    2005-03
    Location
    Greater Los Angeles
    Posts
    546
    Login to Give a bone
    1

    Default Re: Revit formulas yes/no

    You could try parameters in the attached family. The (shared) parameter "Switch Name" is just there if you want A, B or C to report in a schedule or tag.
    Attached Files Attached Files
    Last edited by dduarte; 2009-03-10 at 09:46 PM.

  3. #3
    Member
    Join Date
    2008-04
    Posts
    20
    Login to Give a bone
    0

    Default Re: Revit formulas yes/no

    Thanks David. What you showed me worked with out the IF formular. I'm guessing that was for scheduling?
    ~Scott

Similar Threads

  1. Replies: 0
    Last Post: 2013-07-14, 07:57 PM
  2. Revit, ADT, Formulas and BOMA Calculations
    By phyllisr in forum Revit Architecture - General
    Replies: 4
    Last Post: 2011-12-03, 06:14 PM
  3. Revit Formulas
    By Chirag Mistry in forum Revit Architecture - General
    Replies: 3
    Last Post: 2008-11-13, 09:27 PM
  4. Revit Architecture and algorithmic formulas
    By oliver.smith in forum Revit Architecture - General
    Replies: 6
    Last Post: 2007-09-19, 12:56 PM
  5. Revit Variables, Formulas, Conditions...
    By rtgis in forum Revit MEP - General
    Replies: 5
    Last Post: 2007-05-01, 01:12 AM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •