Originally Posted by
cporter.207875
Still not entirely sure of your set-up, since there are multiple ways to do what you describe. I set-up a project to match your description, the best I can tell, but it doesn't duplicate the error. Check this set-up
Overall Power Plan (floor plan view) with 4 duplicate dependents, each on a sheet by itself, making P1, P2, P3, and P4.
Overall Comm Plan (floor plan view) with 4 duplicate dependents, each on a sheet by itself, making C1, C2, C3, and C4.
Enlarged C4 (callout on C4) placed on sheet E1.
Enlarged P4 (callout reference: Enlarged C4/Sheet E1)