btrusty
2009-05-15, 07:23 PM
so typically, we will just put the revision schedule on our typical titleblock
and when we put a revision on a sheet, the revision info will show up on the typical titleblock
we also have another titleblock that is a design/build; so we cant change their titleblock
there are 3 lines rather than 1 line between revision information on the titleblock
therefore i cant use the standard revision schedule (as every 1 or 2 revisions are behind the horizontal lines), if this isnt clear, i can upload an image if this is unclear.
i was hoping that i could resolve this by doing labels in the spaces (as we do with print date/description) but, unlike the print schedule, there doesnt seem to be a shared parameter for revision schedule
is this possible?
i have googled it, but couldnt find much of any help.
thanks,
and when we put a revision on a sheet, the revision info will show up on the typical titleblock
we also have another titleblock that is a design/build; so we cant change their titleblock
there are 3 lines rather than 1 line between revision information on the titleblock
therefore i cant use the standard revision schedule (as every 1 or 2 revisions are behind the horizontal lines), if this isnt clear, i can upload an image if this is unclear.
i was hoping that i could resolve this by doing labels in the spaces (as we do with print date/description) but, unlike the print schedule, there doesnt seem to be a shared parameter for revision schedule
is this possible?
i have googled it, but couldnt find much of any help.
thanks,