PDA

View Full Version : Drafting Views



Urban D
2004-10-29, 04:03 AM
I have some drafting views in a project which will be the same in a number of future projects. Can these drafting views be saved like to say a library or somewhere and loaded into future projects as they are needed or do they have to be copied from one project and pasted into the next.

Yman
2004-10-29, 04:19 AM
What I do is grab everything in the detail view and then group it. Name it, print it out and put in binder with information about what scale it is and the name of the group. Then export it to a place where you want to store your groups. When you start a new project and get to the detail stage then you look up the details you need to use, create a detail view relating to the scale the group was originally created at (you do this scale check so your leaders and text a right) and then load the group you want. Then place it in the detail view you created. Place on sheet and viola!

Y