amindez9667
2009-06-10, 01:13 PM
Hello
im not sure whether this question has been posted.
is there a way to change the origin of a hatch.
I have a CMU wall with the ledge is at 4" below ground level.
i would like for a full course to start at that elevation instead of
a half of a course.
Any suggestions?
im not sure whether this question has been posted.
is there a way to change the origin of a hatch.
I have a CMU wall with the ledge is at 4" below ground level.
i would like for a full course to start at that elevation instead of
a half of a course.
Any suggestions?