Is there anyone knows that in Revit Project Phasing can affect or not the simulation in Navisworks? As for my porject, need to simulate a multistory building construction, how can I show and hide the temporary site equipment such as tower crane in Naviswork? Do I need to do it in Revit before import to Navisworks or I can do it under Navisworks directly?
Thanks!
Joe Qin
Is there anyone knows that in Revit Project Phasing can affect or not the simulation in Navisworks? As for my porject, need to simulate a multistory building construction, how can I show and hide the temporary site equipment such as tower crane in Naviswork? Do I need to do it in Revit before import to Navisworks or I can do it under Navisworks directly?