ddenton
2009-07-10, 07:18 PM
good afternoon,
is a <Multi-Category> schedule the only way to schedule a column (non-structural)? i do not see Column in the Category list in the New Schedules dialog.
using Revit Arch '09. we have '10, but these items need to be compatible with '09.
thanks.
is a <Multi-Category> schedule the only way to schedule a column (non-structural)? i do not see Column in the Category list in the New Schedules dialog.
using Revit Arch '09. we have '10, but these items need to be compatible with '09.
thanks.