in RAC2010, the conceptual design environment:
I have levels set up that correspond to levels in my project. I have masses that are forms extruded up from level to level. I want to be able to control those in the project environment but am unsure of best way to do this. Is there a way to link the levels in the massing family so that if I change the level elevations in the project the mass will automatically update?
thanks.
I have levels set up that correspond to levels in my project. I have masses that are forms extruded up from level to level. I want to be able to control those in the project environment but am unsure of best way to do this. Is there a way to link the levels in the massing family so that if I change the level elevations in the project the mass will automatically update?