PDA

View Full Version : Foundation Wall Footings



madyb
2009-09-16, 10:02 PM
When placing foundation wall footings under tilt-up panel walls with openings the footing breaks at every opening. You can manually drag the ends together but then you get a line. Is there any work around so the footing is continous for the entire length of the wall?

Thanks in advance

Tim Bosman
2009-09-16, 10:08 PM
There is and it all depends on how the opening in the wall was created.
Here is a link that will give you the answer for your problem.

http://bimandbeam.typepad.com/bim_beam/page/2/

madyb
2009-09-16, 11:05 PM
thank you. I was able to make some of them continuous.