I am trying to put together a schedule that has all of the materials I am using for my project. I'm doing this so hopefully it will make pricing everything easier. In some of the rooms I have a split face, concrete base with a hardwood. I can't seem to see a way to schedule any of the split face materials and was wondering in the process that I take if there is a way to do that.
Thanks.
cliff collins
2009-09-25, 09:29 PM
Make a Material Takeoff Schedule.
see attached
cheers.......
BMcCallum
2009-10-08, 03:26 PM
I am trying to put together a schedule that has all of the materials I am using for my project. I'm doing this so hopefully it will make pricing everything easier. In some of the rooms I have a split face, concrete base with a hardwood. I can't seem to see a way to schedule any of the split face materials and was wondering in the process that I take if there is a way to do that.
Thanks.
And use a Multi-Category schedule.
Powered by vBulletin® Version 4.2.5 Copyright © 2024 vBulletin Solutions Inc. All rights reserved.