comma.zhr
2009-10-07, 01:34 PM
hi, i am new to revit, and as i was fiddling with schedules and material takeoffs, i ran into a pbm. i have a brick wall with concrete columns, unfortunately i must be doing something wrong as when i schedule the brick volume it won't subtract the column that is inside of the wall.
anyone has any ideea of how i can get the real brick volume in the material takeoff? atfirst glance seems like revit doesnt know that the column is inside the wall. if a similar problem has been posted, i apologize, i use revit 2010
anyone has any ideea of how i can get the real brick volume in the material takeoff? atfirst glance seems like revit doesnt know that the column is inside the wall. if a similar problem has been posted, i apologize, i use revit 2010