barrie.sharp
2009-11-09, 04:59 PM
I have attached apic with two conditions. This is a real project.
1. On the left I have Cavity CMU which I want to go to the foundation. If I Join them it goes to the floor structure. I could simply split the floor into one each side.
2. On the right I have a CMU spine wall with a brick footing on the foundation. I want the screed to go upto the CMU and the floor split by the brick. Joining doesn't work here either. I think that I could do these as seperate floors each side and model the screed as a seperate pair on top.
It's a shame you can't cut floors with walls. Should I devide the floors and lock constraints or would inplace voids do it perhaps? What is best practice here?
1. On the left I have Cavity CMU which I want to go to the foundation. If I Join them it goes to the floor structure. I could simply split the floor into one each side.
2. On the right I have a CMU spine wall with a brick footing on the foundation. I want the screed to go upto the CMU and the floor split by the brick. Joining doesn't work here either. I think that I could do these as seperate floors each side and model the screed as a seperate pair on top.
It's a shame you can't cut floors with walls. Should I devide the floors and lock constraints or would inplace voids do it perhaps? What is best practice here?