jkh
2009-11-20, 06:30 PM
Hello all,
I just tried the new structure extension bearing wall foundation, I really like the way it is set up, however I have a small glitch I can't seem to work out. Maybe some of you have already worked thru this and have a solution. I am using a 24"w.x 12"dp. footing and I am making a 16" stepped footing. If you step the hosted wall with the profile sketch tool and then split the hosted wall in elevation length, the foundation length can be adusted in elevation for making the stepped footing this joins together great if you are only making a step the same depth as the footing like a 12" step with 12" deep footings. How do you make the footings join if you are making a 16" step and have a 4" gap between the 12" footings? Maybe a 24"x4" concrete extrusion and then join geometry will work?
Thanks in advance,
James
I just tried the new structure extension bearing wall foundation, I really like the way it is set up, however I have a small glitch I can't seem to work out. Maybe some of you have already worked thru this and have a solution. I am using a 24"w.x 12"dp. footing and I am making a 16" stepped footing. If you step the hosted wall with the profile sketch tool and then split the hosted wall in elevation length, the foundation length can be adusted in elevation for making the stepped footing this joins together great if you are only making a step the same depth as the footing like a 12" step with 12" deep footings. How do you make the footings join if you are making a 16" step and have a 4" gap between the 12" footings? Maybe a 24"x4" concrete extrusion and then join geometry will work?
Thanks in advance,
James