kkintz
2009-12-07, 03:54 PM
I am working on a project that is going out in phases. I have been trying to put each element on their correct phase so that it'll be easier for the contractor to separate when a certain element is being constructed. However when I do this, for example on walls that are in different phases, we lose the connection that the walls used to hold. Does anyone know why the walls are doing this and/or if there is a way to fix them so that while they are on different phases they can still join?