spamless
2004-11-22, 04:45 PM
I am considering a Revit subscription and have a quick question...
Assuming you have your templates all set up, how long would it take on average to draw a basic set of plans for a typical home, say a 1400 sf ranch with 2-car garage. Assume you would need a site plan, foundation plan, floor plan, and elevations. (No 3-D, electrical/mechanical, or documentation)
I am trying to get a rough comparison of Revit compared to Datacad, which I use now. The parametric features of Revit are very appealing, but I know datacad well and have a lot of shortcuts. Thanks
Assuming you have your templates all set up, how long would it take on average to draw a basic set of plans for a typical home, say a 1400 sf ranch with 2-car garage. Assume you would need a site plan, foundation plan, floor plan, and elevations. (No 3-D, electrical/mechanical, or documentation)
I am trying to get a rough comparison of Revit compared to Datacad, which I use now. The parametric features of Revit are very appealing, but I know datacad well and have a lot of shortcuts. Thanks