andrews-n
2009-12-15, 05:12 PM
In the material take off's, is there a way of inputing a calculation to work out the total per m2 in the take off sheet?
patricks
2009-12-15, 06:29 PM
Include Cost and Area in your schedule, then create a calculated value with the formula (Cost * Area / 1 m^2) or something like that.
Look up calculated values in the Help file for more info.
Powered by vBulletin® Version 4.2.5 Copyright © 2024 vBulletin Solutions Inc. All rights reserved.