View Full Version : Shared and Project levels
wadeshuey
2009-12-17, 07:06 PM
Is there a way to move Shared and Project levels together without messing up the sections and elevations??
Alex Page
2009-12-17, 07:28 PM
Have you trued 'Relocate project"?
wadeshuey
2009-12-17, 07:56 PM
Yea the topo points are still at 0' instead of 100' when I am modifying. I need my project base level to be @ 100' so I don't get a negative number on my topo points while modifying the topo. I need 99' instead of -1'. any ideas?
The trouble is the I have drawn the house and when I move the levels alone (project base level) stuff get deleted.... and the sections and elevaions go crazy
Powered by vBulletin® Version 4.2.5 Copyright © 2024 vBulletin Solutions Inc. All rights reserved.