Davied2
2004-12-07, 03:52 PM
Hi There

Our office is currently undertaking a rather large project using Revit, however, as a hard core AutoCad office we have decided that all 1:5 detailing will still be done using AutoCad.

I can sucessfully use callouts using linked Autocad drawings to load correctly into Revit 6.1, but, if someone modifies the DWG file and tell me that a change has occured can I then somehow Re-Load the DWG into my Revit project without saving my project, closing it then re-opening it.

If I use this method it works fine and always loads the latest DWG because its linked but is there a Re-Load method I am missing ?

Regards

David
The Welshman

aaronrumple
2004-12-07, 04:02 PM
You can use the manage link tool to reload external DWG's found under the file pulldown.

Davied2
2004-12-07, 04:38 PM
Aaron

Many thanks for that one I was looking around the properties for a Re-Load option.

Totally missed the Manage Links.

Thanks again

Regards

David
The Welshman