mp.115935
2010-05-07, 10:37 AM
Is it possible to add drawn and checked by in revison shedule.?
Scott Womack
2010-05-07, 11:56 AM
In a drawing List, yes, in a revision schedule, no.
mp.115935
2010-05-07, 12:07 PM
Thanks.
So i have to use plain text.
Powered by vBulletin® Version 4.2.5 Copyright © 2024 vBulletin Solutions Inc. All rights reserved.