My current concern is about scheduling Pads. Currently we are in schematic design and I have accurately modeled all level changes and exterior wall location conveniently using pads and massing (which is working out really well). Now I would like to take a 1st and 2nd level area take-off and I cannot find pads in the ‘available fields’ dialogue. I can read parametric data in the properties of Pads, but I can’t schedule them? What am I missing?
I have been taking area take offs using mass floors for programmed spaces, but I have not modeled masses within circulation. Doing so would solve my problem, but scheduling pads would be easier.
Revit 2011 and Loving it.
I have been taking area take offs using mass floors for programmed spaces, but I have not modeled masses within circulation. Doing so would solve my problem, but scheduling pads would be easier.