Hi,
I've been looking through previous posts but can't seem to find a definite answer to what I'm looking for.
Is there a way to create a schedule that lists every revision that was made and what sheet it was made on (with the date, description, etc. also)? I'm quite new to revisions in general (not just Revit) so I'm not sure what the standard is, but that was one of the things that was desired in a previous meeting.
If the use of Shared Parameters is necessary, that's fine, too.
I've been looking through previous posts but can't seem to find a definite answer to what I'm looking for.
Is there a way to create a schedule that lists every revision that was made and what sheet it was made on (with the date, description, etc. also)? I'm quite new to revisions in general (not just Revit) so I'm not sure what the standard is, but that was one of the things that was desired in a previous meeting.