krish.d.rao
2010-07-28, 03:25 PM
I have been looking to find documentation regarding modifying column grid extents in a copy/monitor environment.
Presently we are working on a large project that has been split up into 5 linked files. The column grids were originally created in one of these files and then copy& monitored across all the other files. Not all of the column grids need to extend from the basement levels to the roof (16th floor). Some grids drop off at the ground and others drop off at various levels above. As you can imagine, the level at which these grids stop keeps changing not infrequently. The issue that we are running into is that every time the vertical extents of these grids are changed, the copy/monitor tool does not seem to pick up the changes to the extents in the linked files.
Does anybody know if this is a limitation of the copy monitor tool or am I missing something. Appreciate your help in advance.
Thanks
Presently we are working on a large project that has been split up into 5 linked files. The column grids were originally created in one of these files and then copy& monitored across all the other files. Not all of the column grids need to extend from the basement levels to the roof (16th floor). Some grids drop off at the ground and others drop off at various levels above. As you can imagine, the level at which these grids stop keeps changing not infrequently. The issue that we are running into is that every time the vertical extents of these grids are changed, the copy/monitor tool does not seem to pick up the changes to the extents in the linked files.
Does anybody know if this is a limitation of the copy monitor tool or am I missing something. Appreciate your help in advance.
Thanks