Robert_DeFranco
2010-07-28, 03:52 PM
I'm working with RAC 2010 with other disciplines linked into the same project. I have create a drawing list for my coversheet by using the scheduling command. Is there any way to format this schedule so that the disciplines are in their correct order? Do I or can I create a parameter so I can group based upon discipline? Thanks for any hepl you can give.