How do I total up a column at the bottom of a schedule? Total length of shear walls for instance. Thanks.
dfriesen
2010-08-25, 03:11 PM
In the Formatting tab of the Schedule Properties, select the parameter which you wish to total, and mark the checkbox for "Calculate Totals". Then in the Sorting/Grouping tab, mark "Grand Totals".