smillies
2010-11-22, 05:12 PM
I'm working on a project where the MEP trades all have separate models. In the electrical model we'd like to copy/monitor the mechanical equipment in. I'm running into a few issues.
1 - When I run a coordination review of the mechanical model, and a piece of equipment has moved, I'm not given the option to move my equipment to match the changes (available actions are postpone, accept, and reject). Is this a flaw in the copy/monitor function or am I doing something incorrectly?
2 - For this job the mechanical equipment will not have the electrical load information entered into it. Instead, I was going to overlay the equipment with a generic motor family containing a connector and our standard 2d symbol. I'd like to anchor this family onto the copy/monitored equipment so that it follows the equipment should it move. Is this possible? It will allow me to create a constraint, but only for the y-axis.
1 - When I run a coordination review of the mechanical model, and a piece of equipment has moved, I'm not given the option to move my equipment to match the changes (available actions are postpone, accept, and reject). Is this a flaw in the copy/monitor function or am I doing something incorrectly?
2 - For this job the mechanical equipment will not have the electrical load information entered into it. Instead, I was going to overlay the equipment with a generic motor family containing a connector and our standard 2d symbol. I'd like to anchor this family onto the copy/monitored equipment so that it follows the equipment should it move. Is this possible? It will allow me to create a constraint, but only for the y-axis.