I'm trying to generate a Material Takeoff schedule, but I need to sort if by Revit Level. I can't seem to do that.

As an example, I have 3 levels in my model. Each level has a mix of existing and new phases. I want to know the area of gypsum board on level 1. I can get it to tell me gyp. for the entire project, but not just that one level. It would also be useful if I could sort by Room.

What am I missing?

Thanks,

Jim

Revitaoist
2011-03-28, 09:00 PM
Create a parameter called "level". Assign the materials and sort as needed.

jim.155208
2011-03-29, 01:28 PM
Thanks, I had found a similar solution. I'm really disappointed that you can't pull out the base constraint of a wall and utilize that in a schedule.

DoTheBIM
2011-03-30, 12:16 PM
Thanks, I had found a similar solution. I'm really disappointed that you can't pull out the base constraint of a wall and utilize that in a schedule.
Agreed. A very long standing complaint/wish list item ( not just on walls either ). Same with scheduling wall height. I'm toying with making my own schedules via ODBC output and can schedule level and wall height as I please via use of queries and reports in MS access. See attached pic. Downside is it's not "live" like it is in Revit.

fc754823
2012-07-04, 08:41 AM
Hi - Having the same issue here. Could you detail how you managed to get your walls scheduled by level. I am not familiar with Access.

nadeeminterior
2021-12-23, 06:29 AM
I'm trying to generate a Material Takeoff schedule, but I need to sort if by Revit Level. I can't seem to do that.

As an example, I have 3 levels in my model. Each level has a mix of existing and new phases. I want to know the area of gypsum board on level 1. I can get it to tell me gyp. for the entire project, but not just that one level. It would also be useful if I could sort by Room.

What am I missing?

Thanks,

Jim

add
Base Constraint, for level

- - - Updated - - -


Hi - Having the same issue here. Could you detail how you managed to get your walls scheduled by level. I am not familiar with Access.

add
Base Constraint, for level