Chris DiSunno
2005-01-11, 10:21 PM
I have made a "floor" of curved walkways. I want to now make them slope up from proposed grade 2'-6" to the entry platforms of my buildings. The floor only seems to allow one slope arrow and since the walks are all a different lengths it won't work.
I tried using a topography. By splitting a flat site and selecting the edges of the floor, then changing elevations of the points. Tedious and the topography has no thickness. (see walk2.jpg).
Anyone have any ideas how I can do this?
Thanks,
Chris Di Sunno
I tried using a topography. By splitting a flat site and selecting the edges of the floor, then changing elevations of the points. Tedious and the topography has no thickness. (see walk2.jpg).
Anyone have any ideas how I can do this?
Thanks,
Chris Di Sunno