avalencia60
2011-08-08, 02:44 PM
Hi everyone, I am doing three options for the front facade of a house, the primary options works fine when cleanup the walls from the main model and the walls in the option but the second and third don't cleanup properly. I want to know what is the best practice to make that the three options cleanup properly with the main model walls. These three design will not become options, but alternatives of design for the house. Please, the attached images of the houses.
I think that doing three design option sets would be the answer.
Thanks in advance.
Alex
I think that doing three design option sets would be the answer.
Thanks in advance.
Alex