PDA

View Full Version : Schedule linking



akshay.korlekar
2011-09-02, 06:08 AM
Is there a way to link a value from one schedule to another. Like say I make a site/ topography schedule and it calculates a particular plot area, can i put this calculated area in a Mass schedule to make further calculations. Thus this plot area is used for calculating usable floor area , etc.
So, basically linking one schedule with another.

Another way to do the same thing would be to do a multi catagory schedule. I.e. a topography/site and a mass schedule together. thereby use parameters from both categories. Is this possible?