Chad Smith
2003-10-23, 12:54 AM
Heres the scenario:
I have a site plan that has 4 phases.
I also have another Revit file that is just a floor plan, this file has 3 phases.
The floor plan file is linked into the site plan file.
How do I go about setting the phase properties so that the correct phase for the site plan and floor plan are showing at the same time?
E.g. Phase 2 for the floor plan is showing when phase 2 for the site plan is showing.
The reason for the linked files is because I have 3 different buildings for the one site, and each linked file has different phases to each other, but have to relate to the overall development phase process.
I have a site plan that has 4 phases.
I also have another Revit file that is just a floor plan, this file has 3 phases.
The floor plan file is linked into the site plan file.
How do I go about setting the phase properties so that the correct phase for the site plan and floor plan are showing at the same time?
E.g. Phase 2 for the floor plan is showing when phase 2 for the site plan is showing.
The reason for the linked files is because I have 3 different buildings for the one site, and each linked file has different phases to each other, but have to relate to the overall development phase process.