View Full Version : Adding Blank Lines Between Schedule Categories?



Limbatus
2012-04-03, 11:27 PM
Good Afternoon. I'm revising the material takeoff schedule in my project, and i'm having some trouble formatting it correctly. What i'd like is for each category to be clustered, with a blank line dividing each category
Like this:

Carpet:
c-01
c-0285015

Metal:
m-01
m-02

Wood:
wd-01
wd-02

rosskirby
2012-04-04, 01:55 PM
You'll have to make sure that there is a parameter to control the Material Group (which can be added in the Fields tab of the schedule dialog box). Then, assign a value to the Material Group parameter for each material (i.e. Metal, Wood, etc., whatever you want your headers to be). Then, in the Sorting/Grouping tab, select the Material Group as the primary sorting parameter, check the boxes for Header and Blank Row, and you should be good to go.