gsteffen642486
2012-11-28, 09:45 PM
In the office we have started using a system of continuous insulation where the wall construction is as follows: Brick, air space, 2" rigid insulation, 6" stud, 1.5" closed cell spray foam in 6" stud cavity and 5/8" gyp. board. Is there a way of getting the spray foam to show up in the stud cavity where it is supposed to be?