Andre Baros
2005-02-11, 03:44 PM
That is to say, we have a project with three phases and would like to show each phase using different display settings. Original historic building, old addition, demo, new work. We can't seam to be able to show each phase with a different linetype/hatch.
Ultimately, what we would really like to to is turn off the wall hatch for the original building but leave it on for the next two phases and have the walls half toned for the first two phases but normal for the latest.
On a similar note, we have a job that needs Existing, Existing not in contract, Demo, and New. We would like to be able to define "In Contract" regions, and "Not in Contract" regions which would let us control the visibility of each separately. In Contract would have medium or fine detailing (depending on the sheet) and Not in Contract would always be course.
This would also be useful to us for tenant build out projects where we have Base Building (Not in Contract, NIC), Demo and New.
Ultimately, what we would really like to to is turn off the wall hatch for the original building but leave it on for the next two phases and have the walls half toned for the first two phases but normal for the latest.
On a similar note, we have a job that needs Existing, Existing not in contract, Demo, and New. We would like to be able to define "In Contract" regions, and "Not in Contract" regions which would let us control the visibility of each separately. In Contract would have medium or fine detailing (depending on the sheet) and Not in Contract would always be course.
This would also be useful to us for tenant build out projects where we have Base Building (Not in Contract, NIC), Demo and New.