2005-02-17, 11:21 AM
Ok. This is probably a simple problem, but i couldn't figure it out. Developing a simple country home dwelling. Using a stack wall - 110mm (brick) base; 250mm (110mm brick, 50mm cavity, 90mm timber stud) brick venner top - for exteriors and standard 90mm studs for internal.
I need to give the developer a schedule for costing, and the wall schedule lists the base of the stack wall and the top of it seperately, but I need to seperate the details of the actual veneer wall in the schedule and add them to the components in the schedule that make up the veneer wall (ie the brick and stud walls).
Help me obi-wan you are my only hope... :D
I need to give the developer a schedule for costing, and the wall schedule lists the base of the stack wall and the top of it seperately, but I need to seperate the details of the actual veneer wall in the schedule and add them to the components in the schedule that make up the veneer wall (ie the brick and stud walls).