WolffG
2013-05-29, 03:38 PM
I am setting up a new project for construction documents. The project consists of two apartment buildings.
The footprints and elevations are different. However, the major components (individual apartment plans, wall sections, schedules, most construction details, etc.) are identical.
The job will be issued as two separate sets of documents.
What is the most practical way to set the Revit files up to avoid as much redrawing as possible?
The footprints and elevations are different. However, the major components (individual apartment plans, wall sections, schedules, most construction details, etc.) are identical.
The job will be issued as two separate sets of documents.
What is the most practical way to set the Revit files up to avoid as much redrawing as possible?