Not that I need this for any real project work, but I had a thought while I was creating revision clouds on a current project.
If I wanted to know how many grids I have in the project I could select on and then use the select all instances in entire project (I'm well over 400 currently)
What I'm wondering is if there's a way to schedule revision clouds to get a quantity.
ie I want to know how many revision clouds I've drawn (total) for all revision sequences.
Why is this important you ask.
Well I just wanted to point out at our next meeting how many I've had to draw. It's one of those things like concrete volume or steel tonnage.
Just a metric that I can use to justify my complaint about the number of revisions I have to make on this project.
Thanks in advance.
If I wanted to know how many grids I have in the project I could select on and then use the select all instances in entire project (I'm well over 400 currently)
What I'm wondering is if there's a way to schedule revision clouds to get a quantity.
ie I want to know how many revision clouds I've drawn (total) for all revision sequences.
Why is this important you ask.
Well I just wanted to point out at our next meeting how many I've had to draw. It's one of those things like concrete volume or steel tonnage.
Just a metric that I can use to justify my complaint about the number of revisions I have to make on this project.
Thanks in advance.