Can I include material volumes from the voids created by piping trenches, assemblies and building foundations. I'm assuming in all these cases that the spoil is replaced by an imported material and that I need to retain 100% of spoil on site.
What I'm trying to do (ignore the details) is well informed cut and fill, based upon everything including the cuts to make the previously mentioned infrastructure.