marekfalkowski693336
2015-02-23, 07:49 PM
I have a sheet family with a revision schedule in it (which is typical). As this is inserted into every sheet view of the project - each sheet view essentially knows what revisions have been applied to this sheet.
I'd like to create a "Drawing list" schedule that includes the revisions included on the sheet. How do i get access to these revision parameters so that i can schedule this information?
I'd like to create a "Drawing list" schedule that includes the revisions included on the sheet. How do i get access to these revision parameters so that i can schedule this information?