blairmack
2015-07-29, 03:09 AM
Hi there,
I'm having issues with binding a linked model and phasing.
The host has phases Existing, Demo and Construction. The linked file has phases Existing Showroom, Demo Showroom and Construction Showroom. I have done the phase mapping exercise in the host file, then clicked on the link and hit the bind button.
The link binds ok and becomes a group as expected, but all the geometry from the linked file has now taken on the Construction phase, so none of the walls doors etc that were on a existing or demo phases in the original linked file, are manageable with view graphic phase filters in views.
Does anyone have any ideas please?
Thanks, Blair
I'm having issues with binding a linked model and phasing.
The host has phases Existing, Demo and Construction. The linked file has phases Existing Showroom, Demo Showroom and Construction Showroom. I have done the phase mapping exercise in the host file, then clicked on the link and hit the bind button.
The link binds ok and becomes a group as expected, but all the geometry from the linked file has now taken on the Construction phase, so none of the walls doors etc that were on a existing or demo phases in the original linked file, are manageable with view graphic phase filters in views.
Does anyone have any ideas please?
Thanks, Blair