trostis
2015-09-01, 08:17 PM
Hi guys,
This is my first post, so be nice to me.
I got to create a Plumbing fixture Count Schedule on Revit 2014, and I used fixed number as a Field format, but what I actually need is a Roundup value.
I have seen many posts about it, but I don't see to get it right.
For example, if I calculate Drinking fountains I have a Schedule Field DF with the Calculated Value (Men +Women)/500 and it gives me a number, but I want to get it to round up by 1. Men and Women are Occupant Load numbers
Any help, will be appreciated.
Thanks and looking forward to use this forum a lot.
UPDATE: I've used the formula roundup ((Men + Women) /500) and it gave me a wrong number (3 instead of 1). Then I tried roundup (Men + Women) /500 and it did round up but not to the next whole number. I think I'm getting closer but I need some help.
Thanks in advance.
Damian
This is my first post, so be nice to me.
I got to create a Plumbing fixture Count Schedule on Revit 2014, and I used fixed number as a Field format, but what I actually need is a Roundup value.
I have seen many posts about it, but I don't see to get it right.
For example, if I calculate Drinking fountains I have a Schedule Field DF with the Calculated Value (Men +Women)/500 and it gives me a number, but I want to get it to round up by 1. Men and Women are Occupant Load numbers
Any help, will be appreciated.
Thanks and looking forward to use this forum a lot.
UPDATE: I've used the formula roundup ((Men + Women) /500) and it gave me a wrong number (3 instead of 1). Then I tried roundup (Men + Women) /500 and it did round up but not to the next whole number. I think I'm getting closer but I need some help.
Thanks in advance.
Damian